Guinea's revised 2026 budget sets aside 10,137.65bn GNF (€1.04bn) for 176 of the 339 projects identified under its Simandou 2040 development program, state news agency AGP said. Total public investment falls 10.13% to 23,562.27bn GNF (€2.42bn), news site Guinee7 said. The president promulgated the revised budget law on November 13, news site Guinéenews said.
Analysis: Simandou 2040 projects now take 43% of Guinea's public investment budget, by our calculation. The Assembly's rapporteur put the share at 43.61%, AGP said. The rapporteur's figure implies a slightly smaller investment base. Total investment fell by about 2.66tn GNF (€273mn) from the initial budget, by our calculation. Guinee7 said projects that were not ready were moved to 2027. This suggests the program was protected while other projects were postponed. Contractors working outside the program face a smaller pool of public works this year. The Guinea Development Board counts 122 megaprojects, not 339 projects. Neither source explains the difference. No date has been set for publishing the list of funded projects.
Source: Agence Guinéenne de Presse (AGP), state news agency, Loi de finances rectificative 2026 (law L-2026-005-AN of November 7, 2026), as adopted by the National Assembly, reported by AGP, 2026 (revised budget); Guinee7.com, Loi de finances rectificative 2026 (law L-2026-005-AN of November 7, 2026), as adopted by the National Assembly, reported by Guinee7, 2026 (revised budget); Guinéenews (private), Presidential decree promulgating law L-2026-005-AN, reported by Guinéenews, November 13, 2026; Guinee7.com, Statement by the Guinea Development Board deputy director general, reported by Guinee7, 2026–2040
Guinea's water investment plan, costed at $3.48bn, has only 11% of its financing secured, according to a presentation to investors at the Simandou Mining Summit reported by news site Guinee7 on November 13. The plan aims to cut technical losses on the water network from 44–48% to 28%. Only 23% of the population is connected to the network of water utility SEG, the presentation said.
Analysis: The summit presentation and the official water compact give different timelines. The compact published with the World Bank in July puts the same $3.48bn over 2026–2030 and gives $640mn a year. The document does not reconcile that figure with the total. The summit version runs to 2040 and seeks $2.1bn by 2030. If 11% of the total is secured, about $380mn is available, leaving roughly $3.1bn to raise, by our calculation. Pipe suppliers and construction firms depend on that gap closing. The report said 2027 looks decisive for closing financing rounds. No date has been set for a donor round.
Source: Guinee7.com, 'Compact Eau Guinée 2026-2040' presentation, reported by Guinee7, 2026–2040 (as presented) and November 2026; World Bank (with the Government of Guinea), Pacte Eau Guinée, final version of July 14, 2026, 2026–2030 and latest (2026 compact)
Guinea is seeking $1.9bn from US, Chinese and multilateral lenders for a multi-user deep-water port at M'Bottiny, south of Kamsar in the Boké region, Mines Minister Bouna Sylla said on the sidelines of the Simandou Mining Summit, Reuters and news site Guinéenews reported on November 16. The port would have a 20-metre draft for Capesize ships of about 200,000 tons, and its feasibility and environmental studies are complete, Sylla said.
Analysis: The bill is large next to the state's own spending. At the BCRG rate of November 17, $1.9bn is about 16,787bn GNF (€1.73bn), or 71% of the revised 2026 investment budget, itself cut by 10%, by our calculation. It also equals 27% of Guinea's 2025 bauxite export earnings of $7.14bn, central bank data show. Sylla said Guinea is courting a broad group of potential funders. Bauxite miners now rely on barges and offshore transshipment, and direct loading would make the industry more competitive, he said. He gave no timeline for choosing investors or starting construction.
Source: Reuters (republished by Mining.com, Engineering News), Reuters, 'Guinea says $1.9 billion deep-water port plan draws US, Chinese interest' (November 16, 2026, republished by Kitco News), Announced November 16, 2026 and Planned (announced November 16, 2026); Guinéenews (private), Guinéenews, 'Simandou Mining Summit : la Guinée cherche 1,9 milliard de dollars pour le port de M'Bottiny' (Alhassane Bah, November 16, 2026), November 16, 2026; Guinee7.com, Guinee7.com, November 8, 2026 (as above), FY2026 (revised budget adopted November 7, 2026); Banque Centrale de la République de Guinée, BCRG, Rapport annuel 2025 (PDF file dated October 20, 2026), 2025; Banque Centrale de la République de Guinée (BCRG), BCRG, Cours de référence des principales devises contre GNF au 17 novembre 2026, Liste N°0218/2026, November 17, 2026
Guinea presented investors with four priority projects worth an estimated $3.8bn at the Simandou Mining Summit, news site Guinéenews said on November 13. They are a bus rapid transit (BRT) system and a second system the report calls HRT for Greater Conakry, a southern coastal road, and solar plants with battery storage at Dabola and Faranah. The report gave no cost per project.
Analysis: The package is worth about 1.4 times Guinea's entire revised public investment budget for 2026, by our calculation. This may explain why the government is seeking private partners. The summit report gives no cost for each project and announces no financing. Urban transport operators and road builders therefore have no tender to bid on yet. A public-private partnership agreement signed with the World Bank's private-sector arm IFC on November 10 covers transport among five sectors. No date has been set for calls for bids.
Source: Guinéenews (private), Simandou Mining Summit final communiqué and presentations, reported by Guinéenews, project cost; Guinéenews (private), Government-IFC agreement, reported by Guinéenews, November 10, 2026; Guinee7.com, Loi de finances rectificative 2026 (law L-2026-005-AN of November 7, 2026), as adopted by the National Assembly, reported by Guinee7, 2026 (revised budget)
Guinea's energy ministry presented investors with a power plan worth more than $3bn at the Simandou Mining Summit, news site Guinee7 said on November 13. The plan prices the Fomi multipurpose dam at $460mn and a 500 MW gas-fired plant at $550mn. It also includes a 225 kV line from Linsan to N'Zérékoré at $400mn and rural electrification at $1.483bn.
Analysis: Two of the main costings match Guinea's national energy compact, the plan prepared under the World Bank and AfDB Mission 300 program. The gas plant at $550mn and the Linsan line at $400mn are identical. The Fomi dam is not. The compact lists the 90 MW dam at $690.28mn, so the summit figure is a third lower, by our calculation. Neither source explains the gap. The plan covers about 35% of the compact's $8.9bn financing need. The compact targets universal access by 2030, from 53%. No date has been set for the dam's tender.
Source: Guinee7.com, Ministry of Energy presentation, reported by Guinee7, multi-year (no period given) and project cost; Government of Guinea, Mission 300 (World Bank / AfDB), Guinea National Energy Compact (Mission 300), project cost and to 2030 and baseline (compact)
In Alama Pro this week
Deep dive: Guinea's investment target needs $4.3bn a year from private investors
13 stories with workings, from the budget, water, Simandou 2040 investment, the 2027 deficit, the M'Bottiny port, urban transport, electricity, bauxite, mining policy and telecoms
Three key figures, from inflation to bauxite exports