Djibouti, Ethiopia and Nigeria's Dangote group launched a US$660mn joint project that includes a 120-kilometer pipeline from Damerjog in Djibouti to Dewele in Ethiopia, with a groundbreaking on September 24, news agency AFP reported. The Damerjog terminal is to store 375,000 cubic meters and handle up to 5mn metric tons of petroleum products a year, AFP and France's economic service in Nairobi said.
Analysis: The pipeline would replace part of the road haulage that now carries Ethiopia's fuel, as about 350 trucks a day leave the Doraleh depot, Ethiopian business weekly Capital reported in February. Its 5mn-ton capacity is a fifth of the 25mn tons planned for the Damerjog oil jetty, by our calculation, so the port is designed for more than this one line. Truckers on the corridor stand to lose volume, while storage operators and pipeline contractors gain work. The timetable remains unclear. France's brief expects commissioning within 18 months, around April 2028, while AFP reported three years of works, which points to about September 2029.
Source: Direction générale du Trésor (France), Service économique régional de Nairobi, DG Trésor, Brèves économiques Afrique de l'Est et océan Indien, 28 septembre-2 octobre 2026, October 2026; Capital Newspaper (Ethiopia), Capital Ethiopia, February 22, 2026, February 2026; Agence France-Presse (AFP), via Connaissance des Énergies, AFP via Connaissance des Énergies, "Djibouti et l'Éthiopie posent la première pierre d'un oléoduc à 660 millions de dollars", September 24, 2026, September 2026